Colin Campbell — Regional Manager, Maintenance & Engineering

Multi-site engineering leader — capital strategy, automation, reliability and complex plant modernization.

I lead projects from operational problem and business case through authorization, design, installation, commissioning and verified ROI.

7

WA sites in my region today

$600M+

Capital portfolio developed & governed

0.8 yr

Best-in-portfolio payback

75 → 8

HC converted to automated FTE

01 — Selected work

Five programs, five dimensions of engineering leadership.

View all projects
01Automation · Industry first

Automated Cod Portioning Line

Manual bandsaw cutting across three locations capped throughput and quality, and no OEM believed cod could be portioned automatically.

0.8 yr
Simple payback
75 → 8
Headcount to FTE
$4M+
Capital project, board approved
Full case study
02Greenfield capital program

Greenfield Processing Plant Program

A 40-year-old multi-level plant was running far past design capacity and carrying nine figures of catch-up capital that bought no new capability.

$500M+
Total installed capital, greenfield program
3x+
Capacity expansion vs. the legacy facility
$90M+
Modeled annual run-rate benefit (yield + labor)
Full case study
03Controls & SCADA platform

Ignition — First Enterprise SCADA

Every asset ran its own HMI island, so line state, stop counts and stop causes could only be gathered by walking the floor.

19+
Assets integrated in phase 1
Enterprise
Scaled beyond the pilot site
Full case study
04Brownfield execution · Shutdown install

Mezzanine Conveyor Optimization

Conveyor crossovers, poor transfers and manual sanitation across four packaging lines were driving contamination risk and product loss.

1.8 yr
Payback
~450,000 lb
Annual mezzanine waste targeted
3 FTE
Labor released (1 floor + 2 sanitation)
Full case study
05Yield & process improvement

Fillet Line Optimization — Multivac Infeed & Skinning

Step loss across the whole-fish-to-fillet flow was running at 11% with no stop-cause data to aim improvement at.

11% → 5%
Site step loss
+2%
Yield recovered
$1MM
Annual savings
Full case study

02 — Capabilities

Capital strategy

Five-year plans, business cases and board authorization.

Automation

Robotics, portioning, grading and packaging lines.

Controls & SCADA

Enterprise Ignition platform, PLC/VFD standards.

Reliability

TPM pillar, predictive maintenance, storeroom and asset management.

Brownfield execution

Shutdown installs inside running plants, commissioned on schedule.

Engineering leadership

10 direct and 65 indirect reports across a multi-site region.

03 — Proof

Scale, and what it produced.

$600M+

Capital portfolio developed & governed

Greenfield plant business case plus multi-site five-year plans

7

Sites in my region

Maintenance, reliability, capital and engineering services

100+

Capital projects tracked

Categorized, prioritized and estimated across the region

75 → 8

Labor converted on one automation line

Manual bandsaw crews to automated-line FTE

0.8 yr

Best project payback

Verified against the model that funded it

$90M+

Modeled annual benefit

Greenfield program run-rate gross margin case

04 — Leadership

Accountable for the plan, the people and the result.

I run maintenance, reliability, capital project management and engineering services for a seven-site region — 10 direct and 65 indirect reports, brownfield plants kept running and improving while the greenfield facility that replaces them is designed.

More about my experience
  • Multi-site engineering leadership
  • Capital program ownership
  • Team leadership & development
  • Brownfield + greenfield delivery
  • Automation & reliability focus
  • Full project lifecycle accountability