Anacortes, WABrownfield (reconfiguration inside a running plant)

Mezzanine Conveyor Optimization

~450,000 lb of mezzanine waste targeted, 1.8-year payback, 3 FTE released

01 — Results

~450,000 lb

Annual mezzanine waste targeted

1.8 yr

Payback

3 FTE

Labor released (1 floor + 2 sanitation)

MetricBeforeAfterDelta
Conveyors15 legacy17 new, zero crossoversReconfigured
Mezzanine waste~450,000 lb (prior year)Targeted out of the processWaste-log basis
Sanitation & floor laborBaseline3 FTE released1 floor + 2 sanitation
Recovery per stopBulk-off5–6 min recirculationAccumulation

02 — Challenge

Four packaging lines shared a mezzanine full of crossovers, poor transfers and belts that could only be sanitized by hand.

Crossovers created cross-contamination risk, transfers created product loss, and every stop dumped product because there was nowhere to accumulate.

03 — My role

Created and owned end-to-end — CAR through commissioning

Timeline: Approval Nov 2025 · Install May 2026

04 — Scope

05 — Execution

06 — Systems & technology

07 — Artifacts & evidence

Anacortes mezzanine 3D layout — packaging line reconfiguration
Anacortes mezzanine 3D layout — packaging line reconfigurationIsometric model showing the mezzanine reconfiguration across four packaging lines: removed crossovers, new 304SS conveyors, CIP belt washers, diverts and recirculation with curtain segregation and dedicated hose reels per zone. Open full size

08 — Key takeaways

Sanitation design was the cheapest part of the scope and the largest share of the labor savings.