Regional, multi-siteOrganizational

PM Step 1 — TPM Pillar

PM Step 1 turned from a slide into a scored, site-owned audit

01 — Results

80%

Audit pass threshold

3

Sub-pillars tracked

Site-owned

Accountability model

MetricBeforeAfterDelta
StandardUndefined per siteScored audit instrument80% pass bar
Sub-pillars trackedNone rolled upEquipment eval, storeroom, PM3 workstreams
AccountabilityCentral gradingSite-owned scoresOwnership moved
Failure dataLogged, unusedFeeds the capital planFunded roadmap

02 — Challenge

Preventive maintenance maturity varied by site with no common definition of what 'done' looked like for Step 1 of the PM pillar.

Central grading does not change behavior. Sites needed to own their own score and see failure data turn into funded work.

03 — My role

Pillar lead and auditor

Timeline: Ongoing

04 — Scope

05 — Execution

06 — Systems & technology

07 — Artifacts & evidence

08 — Key takeaways

The audit only stuck once findings had a funding path. Scores without capital become paperwork.